Des Moines SE 9th St Pump Station
This project included construction of a two-pump storm water pump station including the installation of pumps, mechanical bar screens, electrical and controls building, standby power generator, modification of existing gatewell structure, 12-inch to 78-inch diameter Reinforced Concrete Pipe (RCP) storm sewer, PCC pavement and sidewalk, earthwork, landscaping, asphalt trail, and miscellaneous associated work.