Perry Waste Water Treatment Plant

This project involved the comprehensive construction and rehabilitation of key wastewater treatment infrastructure. The scope of this project included the construction of two lift stations and meter buildings, a nutrient basin, control structures, a rapid mix basin, a clarifier control structure, two clarifiers, and a clarifier pump building. It also featured a UV building, reaeration basin, a WAS holding tank, an operations building, a biosolids loadout facility, a stormwater drain area drain lift station, retaining walls, a dump station and plant outfall piping. Additionally, the project encompassed the rehabilitation and modification of existing facilities, including the pre-treatment building, administration building, aeration basin, digester (blower) building, digesters and biosolids storage tanks. The scope also included the decommissioning and demolition of existing wastewater treatment facilities. The project required coordination of multiple trades including HVAC, plumbing, electrical, controls, painting, and civil site improvements. These things made a successful integration of a new and upgraded system to enhance the facilities operational efficiency and compliance.


© Copyright 2022 Woodruff Construction, Inc. All Rights Reserved.