Squaw Valley Wastewater Treatment Improvements

The Squaw Valley WWTF Improvements project was undertaken to replace an existing above-grade steel package plant system with an Aeromod activated sludge treatment plant. The project included construction of concrete tanks for the treatment system in place of where an existing pond used to sit. Along with this structure, a new blower/control building and a new UV disinfection system were added to the treatment system. Woodruff worked closely with the Owner and the Engineer to ensure timely completion of the project and continued operation of the existing system throughout construction.